• Home
  • About
    • Mission
    • Who We Are
    • TF History
    • Submissions
    • Contact
  • Lloyd Investigative Fund
  • Donate
  • Subscribe to Newsletter
  • Facebook
  • Twitter
Toward Freedom
  • Our Investigations
  • Africa
  • Americas
  • Asia
  • Europe
  • West Asia
  • Reviews

texas

On September 10, the sections of the second Nord Stream 2 pipeline laid from the German shore and Danish waters was connected in a so-called above water tie-in. The opposing pipe strings were lifted from the seabed by the lay barge Fortuna and the pipe ends were cut and fitted together. The welding to connect the two lines took place on a platform located above the water on the side of the vessel. Then the connected pipeline was lowered to the seabed as one continuous string / credit: Nord Stream 2 / Axel Schmidt

The Geopolitics Behind Spiraling Gas and Electricity Prices in Europe

Prabir Purkayastha January 28, 2022 Prabir Purkayastha

Markets do not solve the problem of energy pricing. What is required is planning and long-term investments in infrastructure, writes Prabir Purkayastha.

SIGN UP FOR OUR WEEKLY NEWSLETTER

    Trending

    • Derailing the Engine of Liberty
    • Time to Reverse Course and Change the Conversation from Doomsday to Peace Day
    • Remembering Armistice Day
    • Commentary – The Unfinished Business of the Pan African Congress
    • Host of What’s Going On? Sandy Baird from Burlington, VT is joined by guest Eric Agnero, commentator currently living in Burlington from Ivory Coast, to discuss the Niger Coup and ongoing events in Africa.

    Copyright Toward Freedom 2019